The right solution depends on climate zone, building use (residential/commercial), moisture control requirements, budget, and code requirements. But building science and Canadian code guides give a fairly clear “best practice” approach for insulating cold-formed steel (CFS) framed walls in Canada. Below you can find an outline what that “best solution” typically looks like, and why.
Key Challenges with CFS Framing & What to Solve for
Steel studs conduct heat and cold much more than wood, creating “thermal bridges” that greatly reduce effective insulation if you only insulate the stud cavities.
Without addressing thermal bridging and moisture/air control, you risk “condensation”, “heat loss”, and “structural or durability problems”.
So any “best practice” needs to:
Reduce thermal bridging,
Provide enough insulation (R-value/RSI) for the climate,
Include proper moisture and air/vapor control,
Meet the relevant code (e.g. National Building Code of Canada/energy-code requirements).

Recommended Approach: Exterior Continuous Insulation + Cavity Insulation + Proper Barriers
Many Canadian and North-American design guides recommend — and codes increasingly require — a “hybrid wall assembly”: continuous rigid exterior insulation (a thermal break) plus cavity insulation, with carefully detailed moisture and air/vapor barriers.
In other words: don’t rely on cavity insulation only.
Why this works
Exterior rigid insulation (e.g. foam sheathing) breaks the thermal bridge of the steel studs and ensures the insulation is “continuous” across studs, which greatly improves effective R-value and helps meet energy-code requirements.
Cavity insulation (batts, mineral wool, blown-in, etc.) adds additional thermal resistance, improving overall wall performance.
Proper air barrier, vapor control, and water-resistive barrier must be integrated so that moisture doesn’t accumulate in or on the steel structure, which could cause condensation or corrosion.
Many guide documents for CFS-framed walls show this as the recommended method to satisfy both energy code and durability/moisture control.
What Insulation Levels/Materials You Might Target (for Canada)
Because Canada’s climate is relatively cold (especially in winter), insulation requirements tend to be higher than milder climates. Some rough guidance:
Exterior walls with CFS framing typically target overall wall insulation in the ballpark of R-20 to R-40 (or higher, depending on climate zone and building type).
For many Canadian jurisdictions using the model energy-code path, exterior continuous insulation (ci) is often required for CFS-framed walls to meet code.
For the cavity insulation: you can use batt insulation or mineral wool batts — but crucially, choose batts specifically sized for steel stud spacing (often wider than wood-stud batts), to fill the full cavity including the “C-section” of the steel studs.
Typical assembly might be: rigid foam sheathing on exterior (continuous), then steel studs with batt/mineral-wool cavity insulation, then interior gypsum board, plus proper vapor/air barrier(s) depending on climate and moisture strategy.
Moisture Control, Vapor/Air Barrier Strategy, and Code Compliance
Because steel frames don’t “breathe” like wood, and because of Canada’s cold winters and humid interiors (when heated), it’s critical to address vapor/air/moisture control carefully. Best practice guidance recommends:
A continuous water-resistive barrier (WRB) behind the exterior insulation / sheathing, properly flashed around windows/doors.
A continuous air barrier to minimize air leaks (which cause heat loss and moisture ingress).
For vapor retardation: consider where vapor will condense — often vapour control is placed toward the interior in cold climates; and the ratio of insulation inside vs outside the vapor retarder should be considered so the dew point is outside the structural framing. Guides for steel-framed assemblies refer to that need.
If you ignore these, even a highly insulated wall can suffer condensation and long-term durability problems.
Conclusion: Best-Practice “Solution” (for Most New Builds in Canada)
For a cold-formed steel framed exterior wall in a typical Canadian climate, the “best solution” is generally:
Use “rigid continuous insulation (foam sheathing)” on the “outside” of the steel framing to provide a thermal break.
Fill the framing cavity with “cavity insulation” (batt or mineral wool) sized for steel studs.
Integrate a well-designed “water-resistive barrier (WRB)”, “air barrier”, and “vapor/air control strategy” appropriate for your climate (vapor barrier on interior side, sealed joints, proper flashing, etc.).
Design the wall assembly to meet or exceed required R/RSI-values for your climate zone and building type.
Ensure all materials and construction methods comply with local/national codes, including structural requirements for CFS framing (e.g. CSA S136, etc.) and energy/thermal requirements of the applicable code (e.g. through method described in guides for CFS walls with continuous insulation).
In summary, the best approach for insulating cold‑formed steel framed walls in Canada combines exterior continuous insulation with cavity insulation while carefully integrating air, vapor, and moisture control. This method minimizes thermal bridging, maximizes energy efficiency, and ensures durability, all while meeting Canadian building code requirements. With this approach, there is no need to worry about the insulation performance of CFS walls, as proper material selection and assembly ensure a high‑performance, code‑compliant wall system.